System

 

tigo-image

Max String Length Warning

The max string length may exceed inverter capacity please consult your inverter manufacturer.

Safety Information

For rapid shutdown compliance, all modules must be equipped with TS4-S or higher (includes TS4-O and TS4-L.)
Cloud Connect and Gateway(s) are also required for activation of PV-Safe.
Follow the link for more information about rapid shutdown.

Safety Information

For rapid shutdown compliance, all modules must be equipped with TS4-R-S or higher (includes TS4-R-O)
Cloud Connect and Gateway(s) are also required for activation of PV-Safe.
Follow the link for more information about rapid shutdown.

Bill of materials

Tigo Part Description Quantity
Please configure system.

Optional

Tigo Part Description Quantity

Additional info

Make sure all PV modules are within 50 ft (15 m) from the nearest GW according to a site map, otherwise add an additional GW. See the Gateway Placement Guide for more details.

Contact your distributor for cable and connector options.

Find distributors near you at http://www.tigoenergy.com/where-to-buy/

If the system is bigger than 200kW use Tigo's free system design consulting services by emailing support@tigoenergy.com.