The max string length may exceed inverter capacity please consult your inverter manufacturer.
For rapid shutdown compliance, all modules must be equipped with TS4-S or higher (includes TS4-O and TS4-L.)
Cloud Connect and Gateway(s) are also required for activation of PV-Safe.
Follow the link for more information about rapid shutdown.
For rapid shutdown compliance, all modules must be equipped with TS4-R-S or higher (includes TS4-R-O)
Cloud Connect and Gateway(s) are also required for activation of PV-Safe.
Follow the link for more information about rapid shutdown.
Tigo Part | Description | Quantity |
---|---|---|
Cloud Connect Kit | Cloud Connect Kits come with one Tigo Cloud Connect and one Gateway more info. | 1 |
Gateway | Radio extender used to communicate with smart modules. | 1 |
Please configure system. |
Tigo Part | Description | Quantity |
---|---|---|
Cloud Connect Kit | Cloud Connect Kits come with one Tigo Cloud Connect and one Gateway more info. | 1 |
Gateway | Radio extender used to communicate with smart modules. | 1 |
Make sure all PV modules are within 50 ft (15 m) from the nearest GW according to a site map, otherwise add an additional GW. See the Gateway Placement Guide for more details.
Contact your distributor for cable and connector options.
Find distributors near you at http://www.tigoenergy.com/where-to-buy/
If the system is bigger than 200kW use Tigo's free system design consulting services by emailing [email protected].